News

— JINGSEN ELECTRIC—

Construction and Operation of Photovoltaic Power Generation in the First Half of 2023

Time:

Sep 14,2023

Source:

Author:

On July 27, the National Energy Administration released the construction and operation of photovoltaic power generation in the first half of 2023. In the first half of 2023, the national new grid-connected capacity was 78.423GW, of which 37.46GW was centralized, with a total of 40.963GW distributed and 21.522GW distributed for households.