Solution

— JINGSEN ELECTRIC—

Energy Storage

Provide overall energy storage solutions integrating project development, system design, engineering general contracting, installation and commissioning, and operation and maintenance, and empower customers and partners in such aspects as peak shifting and valley filling, price difference arbitrage, reducing demand and electricity charges, and actively participating in power dispatching to obtain subsidies.

Power Side Energy Storage

The power generation end is charged during the low-end period of the electricity load, and the stored electricity is released during the peak period of the electricity load, which balances the supply and demand relationship in the power grid and improves the reliability and stability of the power grid.

User Side Energy Storage

Industrial and commercial users use energy storage systems to store energy at low ebb and discharge at peak loads, effectively reducing energy waste and improving overall energy efficiency.

Shared Energy Storage

Independent energy storage power station, as an independent capacity to participate in electricity market transactions. Through capacity leasing, it is open to multiple users. Different users can purchase corresponding shares according to their own needs and capabilities. Through fine scheduling management and flexible transaction mechanism, each can get what it needs to achieve a win-win situation for all parties.
< 1 >