Photovoltaic
Provide photovoltaic power station system solutions covering planning and site selection, examination and approval, formalities and compliance, investment and financing, system design, engineering construction, power station commissioning, intelligent operation and maintenance, etc. The solutions are fully adapted to various scenarios such as centralized, distributed and household power stations.
Henan Xuchang Xiji Schindler Elevator Distributed Photovoltaic Power Generation Project
Henan Xuchang West Following Schindler Elevator 7.0MW Distributed Photovoltaic Power Generation Project, with an installed capacity of 7.0MW and an investment of 45.5 million MW, connected to the grid for power generation in June 2017.
BAIC New Energy Laixi Base Distributed Photovoltaic Power Generation Project
The project is a 6MW "full Internet access" 2.3MW "self-use, surplus electricity Internet access" photovoltaic project with a 55.04 million investment and a grid connection in June 2016.
Henan Anyang Zhongbo Vossloh Project
Henan Anyang Zhongbo Vossloh Project Industrial and Commercial Roof Distributed Photovoltaic Power Station. Located in Anyang City, Henan Province, with an installed capacity of 4.44MW, it is an industrial and commercial demonstration project with a large amount of "spontaneous self-use and low-voltage grid-connected access" in Anyang City. It was completed in December 2022 and fully connected to the grid in March 2023.
Luoyang Tongda Distributed Photovoltaic Power Station Project
Located in Tongda Cable Co., Ltd., Shijiawan Industrial Zone, Yanshi District, Luoyang City, with a total installed capacity of 3.25MW and an investment of 11.37 million MW. Phase I of the power station will be connected to the grid in March 2021 and Phase II will be connected to the grid in September 2022.
The annual power generation capacity is 4 million degrees, and the self-use surplus power grid mode is adopted, which can save the owner more than 840000 yuan per year.