Luoyang Tongda Distributed Photovoltaic Power Station Project
Located in Tongda Cable Co., Ltd., Shijiawan Industrial Zone, Yanshi District, Luoyang City, with a total installed capacity of 3.25MW and an investment of 11.37 million MW. Phase I of the power station will be connected to the grid in March 2021 and Phase II will be connected to the grid in September 2022. The annual power generation capacity is 4 million degrees, and the self-use surplus power grid mode is adopted, which can save the owner more than 840000 yuan per year.