Solution

— JINGSEN ELECTRIC—

Photovoltaic

Provide photovoltaic power station system solutions covering planning and site selection, examination and approval, formalities and compliance, investment and financing, system design, engineering construction, power station commissioning, intelligent operation and maintenance, etc. The solutions are fully adapted to various scenarios such as centralized, distributed and household power stations.

Suzhou Senchang Industrial Park Project

Located in Wuzhong District, Suzhou City, Jiangsu Province, the total installed capacity is 1.78MW, the investment is 6.4 million, and the network is connected in December 2020. The measured power generation in the first year is 2 million degrees, and the self-use residual power grid mode is adopted, with a consumption rate of 90%.

Distributed Photovoltaic Power Plant Project of Suzhou Black Shield Environment Co., Ltd.

The 1.1MW distributed photovoltaic power station project of Suzhou Black Shield Environment Co., Ltd. is located in Xiangcheng District, Suzhou City, Jiangsu Province, with a total installed capacity of 1.1MW and an investment of 3.5 million MW. It will be connected to the grid in January 2022. The actual power generation in the first year is 1.2 million degrees, and the spontaneous self-use surplus power grid mode is adopted, with a consumption rate of 80%. The actual measurement saves the owner more than 940000 yuan in the first year.

Distributed Photovoltaic Power Station Project of Suzhou Shounuo High Functional Thin Film (Suzhou) Co., Ltd.

Located in Suzhou Industrial Park, Suzhou City, Jiangsu Province, with a total installed capacity of 0.83MW, an investment of 3.15 million MW, and a network in January 2022. The average annual power generation is about 900000 degrees, and the spontaneous self-use surplus power grid mode is adopted, with a spontaneous self-use rate of 100.

Distributed Photovoltaic Power Station Project of Suzhou Xueliang Electrical Materials Co., Ltd.

Located in Wuzhong District, Suzhou City, with a total installed capacity of 0.8MW, with a grid connection in October 2022. The spontaneous self-use surplus electricity is used to connect to the Internet, the spontaneous self-use rate is 80%, the actual power generation in the first year is 1 million degrees, and the actual measurement saves the owner more than 700000 yuan in electricity charges in the first year.