Photovoltaic
Provide photovoltaic power station system solutions covering planning and site selection, examination and approval, formalities and compliance, investment and financing, system design, engineering construction, power station commissioning, intelligent operation and maintenance, etc. The solutions are fully adapted to various scenarios such as centralized, distributed and household power stations.
Yixing Zhentao Collection Project
The 0.32MW distributed photovoltaic power station project of Yixing zhentaoji technology co., ltd. is located in dingshu town, Yixing city, Jiangsu province, with a total installed capacity of 0.32MW and an investment of 1.21 million MW. it is connected to the grid in may 2023. it adopts the mode of self-use surplus power grid, with a consumption rate of 90%. the actual power generation in the first year is 400000 degrees, and the actual measurement saves the owner more than 200000 yuan in the electricity charge in the first year.
Hebei Chengde Shuangluan District Light Storage Integration Project
Located in Shuangtashan Town and Pian Qiaozi Town, Shuangluan District, Chengde City, Hebei Province. The total planned installed capacity of the project is 200MWp, which will be completed in two phases, 120MWp in the first phase and 80MWp in the second phase. The overall system is equipped with 30MW/120MWh energy storage capacity. The project is currently under construction.
Located in Heizhiguo Township, Guangnan County, Wenshan Zhuang and Miao Autonomous Prefecture, Yunnan Province, it covers an area of about 2016 mu, with an installed capacity of 100MW, a total investment of about 0.45 billion yuan, an average annual effective utilization hour of 1182.74h, and an estimated average annual power generation of 127.83 million kWh. It is currently under construction.
Shanxi Yangqu County Lingjingdian Township 200MW centralized photovoltaic power generation project, 100MW bidding power generation and 100MW parity power generation project, the total investment of 0.748 billion yuan, the total investment of 0.486 billion, December 2020 and July 2021 full capacity grid connection.