Lushan Yaodian Wind Power Project
Located in Lushan County, Pingdingshan, the wind farm is designed with 20 wind turbines, with a single unit capacity of 5.0MW and a total installed capacity of 100MW. The project is supporting the construction of a 20MW energy storage station with a total investment of 0.71 billion. After completion, it can provide 19800 × 104kw h of clean electric energy to the power grid every year, saving 57700 t of standard coal and reducing 29000 t of carbon dioxide emission. At present, the project is under construction. It will be connected to the grid for the first time in September 2023 and is expected to be connected to the grid with full capacity in December 2023.
Weining Roof Distributed Photovoltaic Project is located in Weining Hui, Yi and Miao Autonomous County, Bijie City, the Pearl of the Plateau, which is known as the cool capital of the world and the potato capital. Weining County is 2200 meters above sea level, warm in winter and cool in summer, with sufficient light. Weining Project has a total installed capacity of 80MW and an investment amount of 276 million yuan. It is distributed in 6 villages and towns of Yulong Town, Dougu Town, Zhongshan Town, Longjie Town, Xueshan Town and Niupeng Town. The annual clean electricity generation can be 104 million KWh, using the cooperative mode of roof rental and the grid-connected mode of full Internet access.
Wuxi Mei Ancient Town Project, with an installed capacity of 0.2MW and an investment of 900000, will be connected to the grid in December 2022.
The first phase is the 30MW project of Liujiahe in Yangcheng County, Jincheng City, and the second phase is the 90MW project in Lingchuan County, Jincheng City, with a total investment of 0.486 billion MW, which will be first merged in December 2019 and fully connected to the grid in June 2020.