Lushan Yaodian Wind Power Project
Located in Lushan County, Pingdingshan, the wind farm is designed with 20 wind turbines, with a single unit capacity of 5.0MW and a total installed capacity of 100MW. The project is supporting the construction of a 20MW energy storage station with a total investment of 0.71 billion. After completion, it can provide 19800 × 104kw h of clean electric energy to the power grid every year, saving 57700 t of standard coal and reducing 29000 t of carbon dioxide emission. At present, the project is under construction. It will be connected to the grid for the first time in September 2023 and is expected to be connected to the grid with full capacity in December 2023.