Solution

— JINGSEN ELECTRIC—

Source network load storage

By optimizing the actual demand of load, integrating power supply and grid resources, and combining energy storage technology, multi-level microgrid is formed in different sizes of areas such as households, communities and parks, so as to solve the problem of large-scale new energy and new load access and plug and play. The traditional power system "generation-transmission-change-distribution-use" one-way process, the formation of "source-network-load-storage" integrated cycle process, improve the proportion of new energy power generation.

Jiangsu Yancheng Xiangshui National Energy Power Station Project

Located in Xiangshui County, Yancheng City, Jiangsu Province, with a total installed capacity of 5.99MW, with an investment of 24.55 million MW and a network connection in April 2022. The average annual power generation is 6.1 million degrees, and the full Internet access mode is adopted.

Shandong Binzhou Grain Storage Wind and Photovoltaic Power Station Project

Shandong Binzhou Grain Storage Wind and Photovoltaic Power Station is located in Shandong Binzhou Grain Storage Economic Park, with an installed capacity of 5MW. It started construction in August 2016 and was fully connected to the grid in April 2017.

Jiangmen Haier Electric Appliance Project

Jiangmen Jinling Electric Co., Ltd. (Haier Electric) 3.3MW Distributed Photovoltaic Power Generation Project

Shenzhen YKK Corporation Project

Shenzhen Jitian Building Materials Co., Ltd. (YKK Co., Ltd.) 2.6MW Distributed Photovoltaic Power Plant Project
< 1234...9 >