Source network load storage
By optimizing the actual demand of load, integrating power supply and grid resources, and combining energy storage technology, multi-level microgrid is formed in different sizes of areas such as households, communities and parks, so as to solve the problem of large-scale new energy and new load access and plug and play. The traditional power system "generation-transmission-change-distribution-use" one-way process, the formation of "source-network-load-storage" integrated cycle process, improve the proportion of new energy power generation.
Located in Yuping County, Hebei Province, with an installed capacity of 66MW, it was the largest village-level photovoltaic poverty alleviation project in the country at that time, and was fully connected to the grid in December 2019.
The distribution of power station income implements differentiated support policies, and is distributed according to the degree of poverty and the goal of stable poverty alleviation. A total of 142 poor villages and more than 9430 poor households in the county have been driven, effectively promoting the comprehensive poverty alleviation task in Fuping County.
It is located in Lou Village, Laishui County, Baoding City, with a total area of about 2110 mu and a total capacity of 58.5MW. The total investment of the project is about 0.32 billion yuan, which will start on October 26, 2020 and be connected to the grid on December 30, 2020.
Dingbian Gaoheng Photovoltaic Power Station Project
Located in Bainijing Town, Yulin City, Shaanxi Province, it has a planned total investment of 0.35 billion yuan, a total area of 1300 mu and a construction scale of 50MW. The project has obtained all the preliminary documents and procedures. By the end of September 2023, the project site has completed the site leveling, fence laying, pile foundation foundation, bracket installation and cable laying. The component installation project is partially completed and is expected to be completed by the end of the year.
Dingbian Tianruida Photovoltaic Power Station Project
Located in Dingbian County, Shaanxi Province, the site is located in the sandy grass beach area, belonging to the wind-eroded undulating dune landform, with a total capacity of 50MW and a total investment of 400 million yuan.
Construction started in September 2021, grid-connected in December 2021, and full-capacity grid-connected in September 2022. It can provide 72.5661 million kW h of clean electric energy for the power grid every year, reduce CO2 emissions by about 44100 t, SO2 emissions by about 335.2t, NOX emissions by about 1801.5t, and reduce corresponding wastewater emissions, thus achieving remarkable energy saving and emission reduction benefits.