Centralized photovoltaic
The professional team can provide the whole process of project development, design and development, project management, acceptance and delivery, operation and maintenance management services, using large-scale mountain/desert Gobi/flat/water surface design photovoltaic power station solutions, to build desert photovoltaic, mountain photovoltaic, photovoltaic and other large-scale ground power stations.
It is located in Lou Village, Laishui County, Baoding City, with a total area of about 2110 mu and a total capacity of 58.5MW. The total investment of the project is about 0.32 billion yuan, which will start on October 26, 2020 and be connected to the grid on December 30, 2020.
Dingbian Gaoheng Photovoltaic Power Station Project
Located in Bainijing Town, Yulin City, Shaanxi Province, it has a planned total investment of 0.35 billion yuan, a total area of 1300 mu and a construction scale of 50MW. The project has obtained all the preliminary documents and procedures. By the end of September 2023, the project site has completed the site leveling, fence laying, pile foundation foundation, bracket installation and cable laying. The component installation project is partially completed and is expected to be completed by the end of the year.
Dingbian Tianruida Photovoltaic Power Station Project
Located in Dingbian County, Shaanxi Province, the site is located in the sandy grass beach area, belonging to the wind-eroded undulating dune landform, with a total capacity of 50MW and a total investment of 400 million yuan.
Construction started in September 2021, grid-connected in December 2021, and full-capacity grid-connected in September 2022. It can provide 72.5661 million kW h of clean electric energy for the power grid every year, reduce CO2 emissions by about 44100 t, SO2 emissions by about 335.2t, NOX emissions by about 1801.5t, and reduce corresponding wastewater emissions, thus achieving remarkable energy saving and emission reduction benefits.
The first phase is the 30MW project of Liujiahe in Yangcheng County, Jincheng City, and the second phase is the 90MW project in Lingchuan County, Jincheng City, with a total investment of 0.486 billion MW, which will be first merged in December 2019 and fully connected to the grid in June 2020.